Back River Waste Water Treatment Plant
28 Oct 2016

Back River Waste Water Treatment Plant

Baltimore, MD

Rowen Concrete started production on the BRWWTP in April of 2015. Production began with Auger Cast Piles. Rowen supplied 40,000 cubic yards of grout per the general contractor’s specification, in order for the pile operation to drill 7500 piles. Concrete placement started that same year in September, which Rowen supplied 90,000 cubic yards of structural concrete. Rowen’s upper management team worked very closely with the general contractor to ensure their needs were met, and the project was a success with a projected completion of January 2017.